Greenville Justice Center - 2004 Greenville, Texas Two story steel framed police and courts facility. The structure was designed to accommodate high density rolling files on both the first and second floors. The facility includes a court room, detention cells, dispatch area, police offices and investigator’s offices, the second floor also includes a fitness area.
|
Paris Police and Courts - 2003 Paris, Texas Performed a structural evaluation of an existing one story manufacturing facility prior to the owner purchasing the building. The existing building will be renovated into a police and courts facility including court facilities, a detention center, police offices and an emergency response dispatch area. The emergency dispatch area was designed to withstand an F5 tornado impact and continue to function. |
Lewisville Firing Range - 2002 Lewisville, Texas This new facility houses the practice firing range for the Lewisville Police Department. The roof framing consists of long span tube steel trusses with intermediate beams. The walls are concrete tilt-up with a saw tooth roof profile. The concrete tilt wall has special joints to eliminate any stray bullets from ricocheting through the concrete. |